Procedure starting, stop NITROGEN GENERATOR & maintenance
Preparations before starting NITROGEN GENERATOR
- Crank case heater for Freon compressor, oxygen analyzer, space heater for the panel to be before 24 hrs.
- Cooling water for the compressor and cooler to check
- Drain system pipe lines
- Calibration of oxygen analyzer
- Confirm that the valves on the system piping lines are in the state of starting condition
- Prepare and setting up of air compressor pre cooler / membrane unit.
- Check the manual regulating valve for flow rate and oxygen density adjustment at the membrane outlet module in the position as per the guidelines
procedure Starting nitrogen generator
- Purge mode or auto selected
- Sequential start of the machinery and nitrogen production
- Cold start mode ensures production modes only if oxygen and dew point are as per the set points
procedure Stopping nitrogen generator
- Unload compressor before stopping
- Freon compressor stop
- Draining of system pipe lines
- Delivery valve close and purge valve open
- Power to be off for main heaters and panel
Maintenance
- Membrane unit-inspect and clean the line filter, and replace the membrane element if required
- Air compressor & Freon compressor-check filters and replace elements for them if required, overhaul of compressor and parts replacement as required
- Oil separator-check the differential pressure and replace the filter element, if required
- Lube oil-check and renew/replenish as needed
- Oxygen analyzer-Inspection and replacement of sensor if needed
- Periodical cleaning of the heat exchangers